Turns out we do not get our bay window today - it is coming tomorrow because of the lumberyard. What a headache to get everything coordinated. On the plus side, the three upstairs windows are in, the top section of the house is sided, and they are working on the side right now. They are also putting in the bathroom window, which is the only window that we have here that isn't installed. Nick's trim job looks fantastic, although we do need to paint above the windows (the old trim/windows don't match up directly with the new ones). We've really been enjoying the casements. Some pictures of everything put back together inside:
The airplane roomThe green room - the white stands out so well in here!Our bedroom with the unique oak trim (working on picking out curtains/blinds)
And just in case someone is wondering, here is a picture of the front of the house yesterday evening. It's hard to get a good picture from the right side, but there's a trailer on the left side of the garage that I can't photograph through so this will have to do for now. It really does look nice though.
The shadowy exterior
2 comments:
woah, how did i miss these pictures?
Too lazy to read all 4 posts the first time through?
Post a Comment